CoGri Asia Pacific recently completed a Defined Movement floor construction job at a warehouse building in Tuas Industrial area Singapore for a Swiss company, leaders in research-focused healthcare with combined strengths in pharmaceuticals and diagnostics.
The project comprised constructing a 80mm thick topping slab, to comply with the UK Concrete Society’s TR-34 Table 4.2 Defined Movement Specifications “Category 1”. The total floor casting area was 576.5m2.
In addition, CoGri installed the wire guidance for the BT trucks (with a total length of 154 linear meters) and conducted floor flatness and levelness compliance testing to Category 1 limits upon completion.
For a site visit or advice on the best solution, contact the experts.
"A commendation letter was received by CoGri Asia Pacific Pte..."
Factory ManagerImperial Tobacco Taiwan Manufacturing Co, Ltd
"For the VNA truck wire guidance design & installation in..."
General ManagerOcean Fair International Group FZE
“We have a wide-aisle, reach truck operation in our warehouse..."
Logistics & Warehouse Operations ManagerSanipex Group, Dubai