CoGri Joint StabilisersThe range of services that CoGri Middle East offers in the region continues to expand with the addition of the CoGri Joint Stabiliser.

The stabiliser units have now successfully been installed at 3 large contracts in the UAE. Two of the projects were Laser Grinding & joint repair contracts. The third was a pump screed and joint repair job.

In all instances, the stabiliser units have given clients the option to rapidly re-instate load transference between adjacent slabs without the lengthy downtime that has previously been associated with this type of work practice. The units were installed once joint repairs had been completed, without adding any extra time on to the contract duration.

Benefits of using the CoGri Joint Stabiliser:-

  • Restore positive load transfer at joints
  • A quick, clean and easy cost effective solution with minimal disruption
  • Use the floor immediately after installation
  • Can improve operational efficiency while lowering floor maintenance costs
  • Increases productivity while reducing MHE maintenance and downtime
  • Provide Proven Results – Joint deflection is measured before & after installation
  • Allows slab movement due to temperature changes
  • Cost effectively lowers the risk of accidents, injuries, and damaged product
  • Permanent solution

Floors can be trafficked immediately after the CoGri Joint Stabilisers have been installed

To date, the number of stabiliser units installed is approaching 400 with many future potential contracts looking likely to choose this unique floor joint stabilising solution.

Up to 40 stabiliser units can be installed in 1 day and once installed, the floor can be returned to the client for immediate use.

The rising demand for the CoGri Joint Stabilisers is due to the poor detailing at construction joints where no dowel/load transference system has been implemented. The lack of steel reinforcement to restrain sawn joints from opening freely is another contributing factor. Although FACE Middle East continues to maintain a busy workload for floor designs where load transference is implemented, there are still a lot of existing floors out there, and some new builds, where this is not the case. To restore load transfer problems at concrete joints fast and effectively, choose the CoGri Joint Stabiliser solution.

For more information or to watch the quick and simple CoGri Joint Stabiliser installation process in action, visit www.jointstabiliser.com or email us info@jointstabiliser.com

Click here to watch video

Free Advice

For a site visit or advice on the best solution, contact the experts.

Get In Touch Today

Floor Construction & Flooring Systems

Top quality, cost effective concrete floor construction services for warehouse & industrial units.

Floor Construction Services

Find Out More