Singapore Malaysia South Korea Thailand United Kingdom Middle East, Dubai
Skip Navigation Links
Sitemap

Floor Construction : Topping Slab Floors

When design and programme do not allow construction of the structural slab to tolerance or when extensive upgrading is required, our Topping Slab Floor System is the solution.

Constructed with full mechanical bond or unbonded; starting at 75mm thick, these slabs are finished to tolerance for Free Movement or VNA applications.

CoGri Asia has provided Topping Slab construction to many global clients.

Click here to view some of our clients


Terms and Conditions www.cogrigroup.com