Floor Construction : Mesh Reinforced Large Pour Construction (Jointed)
By far the most cost effective technique of reinforcing a floor using the Laser Screed large pour construction method is with the use of standard mesh reinforcement.
Mesh is placed just in front of the concrete placement on spacers from left to right, in the same direction as the Laser Screed strike off.
All mesh reinforced slabs will have sawn induced joints.
|
|